Location:
Phoenix, AZ
Client:
Baker
Owner:
TSMC
Construction Cost:
12B
PROJECT DESCRIPTION:
Supply, detail, installation reinforcing steel for structures supporting semiconductor manufacturing facility. Includes two fabrication buildings, a water treatment plant, office building, and two central utility plants, along with a tunnel leading to the fabrication structures.