Back to all Projects

TSMC

Location:

Phoenix, AZ

Client:

Baker

Owner:

TSMC

Construction Cost:

12B

PROJECT DESCRIPTION:

Supply, detail, installation reinforcing steel for structures supporting semiconductor manufacturing facility. Includes two fabrication buildings, a water treatment plant, office building, and two central utility plants, along with a tunnel leading to the fabrication structures.