Location:
Taylor, TX
Client:
Baker Concrete
Owner:
Samsung
Construction Cost:
12B
PROJECT DESCRIPTION:
Supply, detail, installation reinforcing steel for structures supporting semiconductor manufacturing facility. Includes two fab buildings, a water treatment plant, office building, and two central utility plants along with a tunnel leading to fab structures.